top of page

C H A P E L  G Y M 

Originally a mock chapel that was really stables, the building was later gutted by fire and then partly rebuilt.

The project involved the conservation and restoration of the original structure. The building was then extended and converted to a training area and gym downstairs with aerobic and altitude training upstairs.

bottom of page